Project: |
Grand Théâtre de Bordeaux, France |
Architects: |
M. Lamendin |
Main Contractor: |
L'Atelier d'Agencement |
Description Of Installation: |
Harlequin Activity sprung floor with Studio surface was installed in a semi-circular shape in the Salle des Peintres, covering 255m2 of the total 500m2 space. |
Notes |
Conversion of room into dance studio with the perimeter of the room designed as a warming-up area, since the height under the original beams was not sufficient for dance practice. The Salle des Peintres is situated immediately above the main opera room and Harlequin Activity was preferred for its acoustic properties. Floor traps were fitted for access to the opera chandelier. |
Floor Plan
Floor Dimensions
|
![]() |
![]() |